Sanford Health Lab HVAC Addition (Revision 1)
Sanford Health
Bismarck, North Dakota
Bid Date:  September 14, 2018

  • Lead Engineer:  Randy Axvig, P.E.
  • Project Manager: Steven Butterfield
  • Lead Engineer:  John Klein, P.E.

Project Details

  • Mechanical work will consist of installation of (8) eight indoor fan coil units with control, chilled water and condensate piping.
  • General work (included in the Mechanical contract) will include ceiling tile removal and replacement and construction of temporary dust barriers.
  • Electrical work will consist of providing power to the (8) eight indoor fan coil units.

Project Downloads

Project bid documents may be downloaded below.  Login is required to ensure your firm is added to the planholder list.  Your the contact information will be used to notify your company contact person of any updates to the bid documents prior to bid.

Addendum Package

  • September 10, 2018
    • Addendum M-1

Planholder List

  • None posted to date.