Public Safety Facility
New Town Fire Department

New Town, North Dakota
Bid Date:  January 15, 2018

623 Main Street
Williston, ND 58801
701.572.6759

  • Lead Architect:  Burton Young

Advanced Engineering and Environmental Services
1815 Schafer St. Suite 301
Bismarck, ND 58501
(701) 221-0530

  • Lead Engineer:  Samuel Wilke

1905 17th St SE
Minot, ND 58701
701.852.6363

  • Lead Engineer:  Caleb Bulow, P.E.
  • Project Manager: Brent Detlaff

1905 17th St SE
Minot, ND 58701
701.852.6363

  • Lead Engineer:  Jason Hunze
  • Project Manager: Jeremy Fairaizl

Project Details

The Project consists of a new (11,846 S.F.), steel frame building with heated floor in the apparatus bay portion. Remaining building is forced air heating/cooling. The building will have a 8’-0” high wall of masonry around the entire apparatus bay exterior and 2’-8” high wall of masonry at the administration portion.  Remaining exterior finishes are metal siding and standing seam roof system. ¾ of the building will be apparatus bay for the fire department vehicles and ¼ of the building will be a meeting room with kitchen, lockers, toilets, radio room, staging room, and offices.  There is an alternate for an exercise space with four bedrooms and an alternate for furniture.

The Scope of Work includes, but is not limited to the following: Concrete Reinforcing, Cast-In-Place Concrete, Channel Drains, Concrete Densifier and Sealer, Unit Masonry, Structural Steel, Steel Joists, Steel Deck, Metal Fabrications, Bollard Covers, Rough Carpentry, Finish Carpentry, Sheathing, Plastic Paneling, Dampproofing, Insulation, Manufactured Metal Panels, Flashing and Sheet Metal, Fire Stopping, Joint Sealers, Sealants and Caulking, Steel Doors and Frames, Wood Doors, Sectional Overhead Doors, Aluminum Windows, Tubular Skylights, Finish Hardware, Glass and Glazing, Gypsum Drywall and Light Steel Framing, Tile, Resilient Flooring and Wall Base, Acoustical Ceilings, Painting, Signs, Toilet Partitions–Polymer, Wall and Corner Guards, Toilet and Bath Accessories, Fire Extinguishers, Lockers-Metal, Laminate Clad Casework, Fire Protection, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Site Clearing, Earth Moving, Trenching-Backfilling and Compaction, Aggregate Base Coarse and Gravel Surfacing, Rip rap, Sanitary Sewer Utilities, Storm Sewer.

Opinion of approximate estimated Base Bid cost:  $3,300,00.00+

Opinion of approximate estimated Alternate G-1, M-1, & E-1 cost:  $360,000.00+

Project Downloads

Project bid documents may be downloaded below.  Login is required to ensure your firm is added to the planholder list.  Your the contact information will be used to notify your company contact person of any updates to the bid documents prior to bid.

Construction Document Package

  • Advertisement for Bids
  • Project Manual, Divisions 1-12, 21-23, 26-28, 31-33
  • Construction Documents

Downloads to date: 11.  File size: 53.6 MB.   

Addendum Package

  • Addendum 1 – issued February 9, 2018
  • Addendum 2 – issued February 15, 2018

Planholder List