Plan Room

DSU May Hall CD
Last update: October 12, 2017
File size: 22.6 MB

Project Designers

M: Randy Axvig P.E./
Matt Fischer
E: Jeremy Butman P.E./
Curt Johnson
G: Janet Prchal, AIA/
Travis Bean
S: Jordan Geiger, P.E.

Addendums

October 19, 2017
Addendum G-1
Addendum M-1

Plan Holders List
Will be posted here.

Project Details

Dickinson State University
May Hall HVAC Upgrade

Dickinson, North Dakota
Re-Bid Date:  November 2, 2017

Mechanical Work:  The existing heat pump system will be upgraded to support an additional floor for a total of three out of the four floors. The two existing floors served by the heat pump system will have new heat pumps installed. The existing cooling tower will be replaced and a new outdoor energy recovery unit will be installed to provide fresh and exhaust air to the three floors.

General Work:  Work associated with the upgrading of the HVAC system such as ceiling removal and replacement miscellaneous wall patching, structural support systems for the new cooling tower and outdoor energy recovery unit.

Electrical Work: Electrical work will consist of work involved with disconnect and reconnect of heat pumps, providing new circuits for new heat pumps, cooling tower, energy recovery unit and associated pumps and other mechanical equipment. Removal of lights in association with ceiling removal and replacement.

Project bid documents may be downloaded by filling out the following information.  Your firm will be added to the planholder list and the contact information will be used to notify your company contact person of any updates to the bid documents prior to bid.


Parkade Sump CD
Last update: September 14, 2017
File size: 2 MB

Project Designers

M: Randy Axvig P.E./
Eric Miller

Addendums

Will be posted here when available.

Plan Holders List
Will be posted here when available.

Project Details

Parkade Building
Remote Sump Replacement

500 block of East Broadway Ave,
Dickinson, North Dakota
Bid Date:  October 5, 2017

Mechanical Work:  Will consist of disconnecting the existing supply and return piping to and from the existing cooling tower remote sump, removal of the cooling tower remote sump, and installation of a new cooling tower remote sump in the same location and reconnecting of the existing piping to the new sump.

Project bid documents may be downloaded by filling out the following information.  Your firm will be added to the planholder list and the contact information will be used to notify your company contact person of any updates to the bid documents prior to bid.


Ramkota Boiler CD
Last update: April 5, 2017
File size: 7.96 MB

Project Designers

M:  Jerod Nelson
E: Jeremiah Thurn

Addendums

Addendum 1, issued April 11, 2017
Addendum 2, issued April 18, 2017  

Current as of April 18, 2017

Planholder List Download

Project Details

Ramkota Hotel
Boiler Upgrade

Bismarck, North Dakota
Bid Date:  April 20, 2017

Mechanical work will consist of the removal of the existing hot water heating boilers, heat exchangers, and associated hot water heating and heat pump piping; installation of modular hot water heating boilers, heat exchangers, pumps, boiler venting, associated piping and controls. General work and electrical work will be considered incidental work to the mechanical work and included in the mechanical contractors bid.

General work will consist of additional floor and roof framing and rough cutting and patching for the new boiler flue system.

Electrical work will consist of disconnecting the existing mechanical equipment being removed and connections to the new equipment.

Project bid documents may be downloaded by filling out the following information.  Your firm will be added to the planholder list and the contact information will be used to notify your company contact person of any updates to the bid documents prior to bid.

This project was successfully bid. Bid results may be downloaded below.


Download

Project Downloads